When Restoration Costs Are Deferred, the Loss Headline and the Rate Filing Diverge
A large storm or a long outage produces two numbers that look like one number. The first is what a regulated electric utility spends to put the system back: crews, poles, transformers, mutual-aid billing, overtime. That money leaves on a schedule of days and weeks. The second is what the utility is eventually permitted to collect for that spending, which arrives on a schedule that a regulator sets and that is measured in months and years. Headlines report the first number. Filings decide the second one.
The read that matters for a position is not the size of the restoration bill. It is three narrower questions: whether a deferral or accounting order exists, whether a commission has ruled on prudence, and which recovery vehicle the order names. Each of those has a date attached to it. The storm does not.
The Accounting Move That Separates Cash From Earnings
The Federal Energy Regulatory Commission's Uniform System of Accounts for public utilities defines the mechanism directly. Under 18 CFR Part 101, General Instructions, Definition 31, regulatory assets and liabilities "arise from specific revenues, expenses, gains, or losses that would have been included in net income determination in one period under the general requirements of the Uniform System of Accounts but for it being probable" that the item "will be included in a different period(s) for purposes of developing the rates the utility is authorized to charge for its utility services."
Two words in that sentence do most of the work.
- Probable. The deferral rests on an expectation about a future regulatory outcome. It is a judgment, and judgments about probability can be revised when the record changes.
- Different period. The cost is not erased. It is moved. Cash has already gone out; what shifts is when the charge shows up in reported results.
The practical consequence is that a very large spending event can pass through a reporting period with a muted income-statement effect while the balance sheet grows a deferred balance. The reverse is also true: a period with no storm in it can carry a large charge, if that is the period in which a commission ruled that part of an older deferred balance is not recoverable. Whether the deferred balance accrues carrying costs while it waits is set in the individual order rather than by a general rule, so it is not safe to assume either way without reading the order.
Stage sequence and statutory maxima. Sources: 16 U.S.C. 824d(d)-(e); N.Y. Public Service Law 66(12); Fla. Stat. 366.8260(2)(b).
Three Clocks, and None of Them Runs on the News Cycle
Rate recovery is not a single national process, and the timing differences between the processes are written into statute. Three examples, all verifiable in primary text, span most of the range.
- Rates filed with FERC. Under the Federal Power Act, 16 U.S.C. 824d(d), "no change shall be made by any public utility in any such rate, charge, classification, or service ... except after sixty days' notice to the Commission and to the public." Under subsection (e), the Commission "may suspend the operation of such schedule ... but not for a longer period than five months beyond the time when it would otherwise go into effect." At the statutory maximum that is roughly seven months from filing.
- A retail rate case in New York. Public Service Law 66(12) requires "thirty days' notice to the commission and to each county, city, town and village served by such utility," and permits the commission to suspend the operation of the schedule "but not for a longer period than fourteen months beyond the time when it would otherwise go into effect." At the maximum, roughly fifteen months.
- Storm-recovery bonds in Florida. Florida Statutes 366.8260(2)(b)1 puts a hard clock on the financing path: "Within 7 days after the filing of a petition, the commission shall publish a case schedule ... that will permit a commission decision no later than 120 days after the date the petition is filed," and "no later than 135 days after the date the petition is filed, the commission shall issue a financing order or an order rejecting the petition."
Those are maxima, not typical durations, and they belong to different proceedings rather than to one sequence. The point is the spread. The same category of cost can sit on a statutory clock of about four and a half months in one path and about fifteen months in another, depending on which body has jurisdiction and which vehicle is being used. Retail rate schedules are filed with a state commission under state law; the Federal Power Act provision applies to rates filed with FERC. A reader who assumes one national timetable will consistently mis-date the events that matter.
The usable implication is that the dated items are procedural: the petition filing, the published case schedule, the hearing, the statutory decision deadline, and the order itself. A storm carries no date attached to a financial outcome. A 135-day deadline does.
What the Reliability Data Says About Which Number Moves
The U.S. Energy Information Administration publishes distribution reliability metrics collected on Form EIA-861, and it publishes them twice: once including major event days and once excluding them. Table 11.1 of the Electric Power Annual carries both series for the U.S. total. The gap between them is the clearest available illustration of how an event-driven series behaves next to an operating baseline.
Source: U.S. Energy Information Administration, Electric Power Annual, Table 11.1 (Form EIA-861), U.S. total, IEEE method. Lower block is SAIDI without major event days; upper block is the all-events figure minus that baseline.
In 2024 the all-events figure was 662.6 minutes per customer. The same year, excluding major event days, it was 131.6 minutes. The difference, 531.0 minutes, is 80.1 percent of the total. In 2023 the same calculation gives 366.6 minus 123.9, or 242.7 minutes, which is 66.2 percent.
Year over year, the all-events series rose 80.7 percent from 2023 to 2024. The baseline series rose 6.2 percent. Across the full eleven years shown, the without-major-event-days figure stayed inside a band from 114.2 to 131.6 minutes, a spread of about 15 percent. The all-events figure ranged from 209.0 to 662.6 minutes, a factor of 3.2.
Two rules follow from the way EIA defines the split, and both are stated in the table's own footnotes.
- Never compare across the two series. A with-major-event-days number set against a without figure produces a difference that is entirely an artifact of the definition. This is the single most common way the data gets misused.
- A "major event day" is a relative threshold, not an absolute severity. The footnote states that "a Major Event Day is any day that exceeds a daily SAIDI threshold called Tmed," and that "Tmed is a duration statistic calculated from daily SAIDI values from the past five years." The threshold is therefore specific to the reporting system and its own recent history. EIA also notes that for utilities not using IEEE methods, "Major Events are self-determined by the reporting utility."
Reliability minutes are not dollars, and nothing in Table 11.1 measures restoration cost. What the table does show is the shape of the thing being measured. The observable headline series is dominated by a tail of exceptional days, while the underlying operating series barely moves. A cost headline behaves the same way. The extraordinary bill is the tail. The recoverable base is the quiet series underneath it.
The other side of the ledger is equally observable and equally slow. In EIA's Electric Power Annual Table 2.4, the U.S. average retail price of electricity across all sectors was 12.94 cents per kilowatthour in 2024 against 10.59 cents in 2020, up 22.2 percent in four years; the residential figure was 16.48 cents against 13.15 cents, up 25.3 percent. A large deferred balance enters that series as an increment spread over a defined period, which is why the customer-side effect of even a very large approved amount is rarely dramatic in any single year, and why the room for recovery narrows once the underlying price series has already climbed.
Where the Recovery Path Breaks
Branch points between a cost headline and an earnings effect. Regulatory asset definition: 18 CFR Part 101, General Instructions, Definition 31.
The frame described so far assumes the recovery path holds. It has identifiable places where it does not.
No deferral authorization
Deferral is not automatic. It depends on an accounting order or an equivalent authorization, and on the probability test in Definition 31 being satisfied. Where that authorization is absent or not sought, the cost is recognized when incurred and the earnings effect tracks the headline closely.
Prudence disallowance
A deferred balance is a claim, not a settled receivable. The review tests whether the spending was reasonably incurred. The consequence of a partial disallowance is that the disallowed portion is written off in the period of the ruling, which converts a long-dated regulatory question into a discrete, dated earnings event, often long after the original news coverage has ended.
Gross is not recoverable
Statutory definitions frequently net out other recoveries before the number ever reaches customers. Florida's storm-recovery statute defines storm-recovery costs as costs incurred in undertaking a storm-recovery activity "net of insurance proceeds," with adjustments for capital replacement and operating costs. The gross number in a press report and the amount eligible for collection are different quantities from the outset, and the gap includes insurance, and any amounts already collected through an existing reserve.
Securitization changes who holds the balance
Where a financing order is issued, the same statute defines storm-recovery bonds as instruments "issued by an electric utility or an assignee pursuant to a financing order, the proceeds of which are used directly or indirectly to recover, finance, or refinance commission-approved storm-recovery costs," repaid through a storm-recovery charge "imposed on all customer bills." That path differs from base-rate recovery: the balance is monetized up front and the collection stream services the bonds. Which path an order takes is not knowable in advance from the size of the cost.
Reading Exposure Without Naming a Ticker
The exposure categories around a large restoration event are not one category, and they respond to different dates.
- A rate-regulated operating utility. The recovery mechanics above apply directly. The dated events are procedural filings and orders.
- A holding structure with regulated and unregulated segments. Only the regulated portion has access to the deferral mechanism. Costs arising in an unregulated segment have no rate case to be moved into.
- Suppliers of poles, conductor, transformers, and contract line crews. Their revenue is the utility's spending, so their exposure attaches to the restoration phase rather than to the recovery phase. The two phases can be separated by a year or more.
- Insurance exposure. The "net of insurance proceeds" language points at where part of the gross number is absorbed before it reaches a rate proceeding.
None of that is a view on any particular security. The reason to draw the map is that one headline number tends to get applied across all four categories on the day it prints, even though each category is exposed to a different event on a different clock.
What Would Invalidate This
- Reliability minutes are a proxy, not a cost series. Table 11.1 measures interruption duration. If cost per outage minute varies widely across event types, the ratio observed in minutes says nothing precise about the ratio in dollars. The chart supports a claim about shape, not magnitude.
- The major-event classification is not uniform. Tmed is computed from each reporting system's own prior five years, and EIA states that non-IEEE reporters self-determine major events. The national aggregate therefore mixes methods, and a national number should not be pushed onto any single system.
- Statutory timelines do not generalize. The New York suspension limit is New York's and the Florida storm-recovery clock is Florida's. Not every jurisdiction has a securitization statute. Reading either as a national default will produce wrong dates.
- The frame requires rate regulation. If the affected operations are not rate-regulated, none of the recovery mechanics apply and the cost behaves like an ordinary charge.
- The probability test can fail. If a deferral is denied, or if recovery stops being probable, the accounting reverses the logic and the deferred balance becomes a charge.
- Prior pricing. This frame identifies where information arrives, not whether it is new. If a recovery path is already reflected in prices, the dated events can pass with no reaction, and a quiet order date is evidence the question was already resolved.
Concrete Framework
- Establish whether a deferral exists before treating a cost number as an earnings number. Look for an accounting order, a deferral petition, or an explicit statement that costs are being deferred. If none exists, the branch tree above terminates at the first node and the headline is closer to the earnings effect.
- Identify the jurisdiction and write down its two statutory numbers. The notice period and the maximum suspension period. For a FERC filing those are 60 days and five months; in New York, 30 days and fourteen months; for a Florida storm-financing petition, a 135-day decision deadline. Use the statute governing the specific proceeding, not an average.
- Convert gross to recoverable. Subtract insurance proceeds, amounts already collected through any existing reserve, and any portion arising outside the regulated entity. The remainder is the number the proceeding is about.
- Calendar the procedural dates, not the event date. Petition filing, published case schedule, hearing dates, statutory decision deadline, order issuance. These are the points at which information is scheduled to arrive.
- Keep the two reliability series apart in any analysis. When pulling EIA Form EIA-861 data, record whether each figure includes or excludes major event days, and never difference across the two. Label every number in the working file.
- Decide which phase the exposure is in. Restoration spending and rate recovery are separate phases with separate beneficiaries and separate dates. A position built on one and sized for the other is wrong on timing even when it is right on direction.
- Size for a dated disallowance risk. A prudence ruling can land as a single-day write-off in a period with no operational news in it. If a deferred balance is material to the thesis, the ruling date belongs in the risk plan rather than in the assumption set.
- Record the assumptions with the date they were made, and re-check at the order. The order resolves the probability test, the recoverable amount, the collection period, and the vehicle. Any conclusion formed before it is provisional by construction.
- Get link
- X
- Other Apps
Popular Posts
Trading Value vs. Market Cap — What the Numbers Actually Tell You About Who's Driving the Market
- Get link
- X
- Other Apps
Which Settlement Date Does the Short Interest Number on Your Screen Describe
- Get link
- X
- Other Apps
Comments
Post a Comment